占位边距

Mobile Container Prefabricated Substation E-House 10kV 20kV 35kV

  • Mobile Container Prefabricated Substation E-House 10kV 20kV 35kV

Key attributes

Brand Rw Energy
Series YB
Rated Voltage 11kV 10kV 20kV 35kV
Rated Current 400A ~ 3150A
Rated Frequency 50/60Hz

Description

Overview

The prefabricated cabin substation is composed of a prefabricated cabin, primary and secondary substation equipment, and cabin auxiliary facilities. Prefabricated in the factory, including assembly, wiring, commissioning, etc., is transported to the construction site as a whole and installed on the foundation. It is based on the core concept of "standard distribution type" of the State Grid, and is designed on the basis of the traditional box transformer and combined with the style of the container.

Product features

  •  High reliability:Safe and reliable operating environment, completely maintenance-free prefabricated cabin structure, internal air conditioning, constant temperature and humidity.

  • Standardization:The specifications of the cabin were modified to make it suitable for substation use.

  • Modularity:The cabin is divided into several modular compartments according to the different functions of the electrical equipment, and through the coordinated work of each module, the prefabricated cabin substation becomes a new type of power transmission and distribution facility.

Factory:All equipment installation and commissioning are factory-based.

Low noise:Sound barrier technology is used to reduce transformer noise.

Beautiful appearance:The integrated design concept of cabinets and the modular structure of building blocks are harmonious and unified with the urban style.

Fast website construction:The station can be put into operation in a period of 3~6 months.

High service life;The main components are completely maintenance-free, and the cabin is rust-resistant for 30 years and has a service life of 60 years.

Cabin structure

Serial number

Name

Description

Standard configuration

Optional configuration

1.1

The layout of the main equipment

The main equipment is arranged in a single row or in two rows facing each other

Project design/customized products

1.2

skeleton

Frame type steel structure welding

Sheet metal buckle box structure

1.3

Steel surface treatment

Spray paint

Galvanized

1.4

door

Steel insulated door/escape door

Class B fire door

 

 

1.5

 

 

walls

Exterior siding

Kinbang Plate (FC Board)

Profiled steel plate, metal carved plate, stainless steel plate, etc

Insulation

Rock wool

Polyurethane, glass wool

Interior wall panels/ceiling panels

Handmade sandwich panels

Aluminum composite panel, profiled steel plate, metal carved plate, etc

Others

Fireproof board

European pine board, polyethylene hygroscopic film

1.6

Top cover (double layer)

Outer roof

Profiled steel plate

Resin tiles, stainless steel plates, galvanized steel plates

Inner roof

Rock wool sandwich panel

Galvanized steel plate, stainless steel plate

 

1.7

Base plate

Lower board

steel plate

NAFC board

Upper plate

Insulating rubber pads

PVC anti-static coil plate, patterned steel plate

Auxiliary electrical

Serial number

Name

Description

2.1

Cabin power distribution

Distribution box, indoor lighting, emergency lights, safety exit indication, power sockets, panel switches, etc

2.2

Fire alarm system (optional)

Smoke/temperature detector, manual alarm button, sound and light alarm, fire alarm control box

2.3

Video surveillance system (optional)

Indoor cameras (medium speed balls), auxiliary lights, access control switches, etc

Grounding protection

Serial number

Name

Description

3.1

cabin

The base is reserved for grounding blocks to be connected to the main grounding network on site; at the same time, the base can be welded with the embedded metal parts of the foundation

3.2

Primary/Secondary Grounding (Optional)

Reserve the grounding strip, the main equipment is connected to the grounding strip through the grounding cable, and the grounding grid is connected to the on-site grounding network to complete the grounding of the entire primary and secondary system

Heating, Ventilation and Air Conditioning (HVAC)

Serial number

Name

Description

Standard configuration

Optional configuration

4.1

Fans

Axial flow fan, ventilation heat dissipation or ventilation

Automatic heating fan and damper

4.2

Air conditioning

Industrial air conditioning, refrigeration and heating, adjusting indoor temperature and humidity

Ceiling air conditioning/household air conditioning special air conditioner

4.3

Electric heater (optional)

Integrated industrial electric heater, which can automatically adjust the indoor temperature, keep warm in winter, and adapt to alpine areas

Product delivery

Serial number

Name

Description

Standard configuration

Optional configuration

5.1

Site foundation

Civil cement foundation

Steel structure support

5.2

Mode of transportation

Road vehicle transport

The buyer picks it up

5.3

Lifting method

Bottom ring lifting

Can be designed/customized according to specific projects

5.4

Product delivery

Overall factory delivery

Modular assembly into a whole on site and delivery

5.5

Applications

Power generation, power grid, transmission and distribution, new energy, real estate, petrochemical, port, mine, etc

5.6

Cabin size

12.2x2.8x3.2m, length and width are flat layout design

Dimensions (actual size is determined according to drawings)

<20x7x4m,

Modular design\transportation\assembly

Application Scenarios

  • Photovoltaic / Wind Power Plants:As a step-up station, it boosts the low-voltage power output from new energy sources to grid-connected voltage. Pre-assembled and pre-tested in the factory, it is transported to the site as a complete unit, significantly shortening the construction cycle and adapting to various complex scenarios.

  • Energy Storage Station Support:It forms an integrated energy storage station when paired with energy storage equipment, enabling power storage and grid dispatch, while supporting rapid deployment and future expansion.

  • Temporary / Emergency Power Supply:Provides temporary power for construction sites, large events, and post-disaster reconstruction. It can be relocated and reused after the project, and also serves as an emergency backup power source during grid outages.

  • Industrial & Data Centers:Delivers high-reliability dedicated power distribution for factories, industrial parks, and data centers. Its integrated design reduces on-site construction work and meets fast-track commissioning requirements.

  • Remote Areas / Harsh Environments:Supplies power to remote locations such as oilfields, mines, pastures, and islands, solving the challenges of traditional substation construction. The cabin is built to withstand high temperatures, humidity, sandstorms, and other harsh conditions.

Solutions for Mobile Substation

  • Prefabricated Boost Transformer Substation Solution for Photovoltaic Power Plants in Skid-Mounted Design
    The Rockwell Energy modular prefabricated step-up substation integrates medium-voltage switchgear, step-up transformers, and low-voltage distribution into a steel frame that has been factory-assembled and undergone routine testing. Upon arrival at the site, it can be “put into operation immediately”—shortening the grid connection cycle from the 3–6 months typically required for conventional substations built on-site to about 2 weeks. The amount of civil construction is reduced by 70%, and the op
  • Skid-mounted Mobile Substation for Open-Pit Mining Areas
    The skid-mounted substation at the Rockwell Energy mine uses an integral steel frame to support medium-voltage switchgear and transformers. It can be moved either by crane lifting or tractor towing, eliminating the need for civil construction or dedicated switchgear rooms. As the open-pit mining face advances, the substation can be relocated within 1–2 days. Its open-design ensures reliable operation even in dusty environments without any reduction in capacity.1. Why does power supply in mining
  • Prefabricated Power Distribution Unit Solution for Data Centers
    The Rockwell Energy data center prefabricated power distribution unit integrates medium-voltage incoming lines, transformers, and low-voltage distribution into a factory-tested steel frame. It supports N+1 redundant operation with dual transformers and dual low-voltage sections, enabling rapid scalability as the data center is commissioned in phases. Its open-frame design facilitates easy inspections and reduces fault-repair time.I. Why Data Center Power Distribution Needs PrefabricationThe elec
Send inquiry
+86
Click to upload file
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
App Store
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.
Email
E-mail
Chat
Manager
WhatsApp
WhatsApp