The collection features typical success cases of the company across multiple regions and industries worldwide, covering three core business areas: including a commercial and industrial energy storage system project at a factory in Europe (achieving a 30% reduction in electricity costs), an EV charging network project for a community in North America (compatible with the NACS standard, meeting the charging needs of 500+ parking spaces), and a smart grid optimization project in a region of Asia-Pacific (reducing fault recovery time by 80% through recloser controllers and distribution automation systems), among others.

RW Energy Colombia PV Plant 35 kV Recloser Controller Project Case Study


01 Project Background

1.1 Project Background

Colombia is a core market for photovoltaic (PV) development in Latin America. However, its grid environment differs significantly from others. Solar irradiance fluctuations lead to highly stochastic PV output, resulting in low-inertia grid characteristics. Additionally, strong local electromagnetic interference and frequent frequency fluctuations pose extreme challenges for fault recovery and frequency stability control.

In the initial stages of a large-scale PV plant's connection, the existing recloser controllers were not adapted to the Colombian grid. Specifically, the core 81R frequency protection failed to meet local regulation requirements. Instead of identifying faults and optimizing reclosing sequences, it exacerbated frequency fluctuations, leading to frequent tripping on the PV side. This severely impacted generation efficiency and grid stability, causing significant financial losses and O&M pressure for the owner.

To resolve these challenges, the PV plant officially introduced RW Energy 35 kV recloser controllers in 2024. Leveraging RW Energy’s technical expertise in PV grid-tied protection and frequency stability control, a customized solution was provided to precisely adapt to the local 60 Hz grid, achieving rapid fault recovery and coordinated frequency regulation.

RW Energy Colombia PV Plant 35 kV Recloser Controller Project Case Study

1.2 Core Product and Parameters

A total of 88 units of 35 kV recloser controllers, along with accessories and spare parts, were deployed.

Item

Technical Details

Product Name

35 kV PV Grid-tied Recloser Controller

Model

RWK-352HBV

Rated System Voltage

35 kV

Rated Frequency

60 Hz (Adapted to Colombia Grid Standard)

Core Functions

81R ROCOF Protection, Adaptive Reclosing, Fault Identification

Supply Quantity

88 Units

Installation Site

Grid-tied side of Colombia PV Plant

Commissioning Year

2024

1.3 Technical Drawings

The project utilized comprehensive electrical schematics for the RWK-352HBV 35 kV outdoor permanent magnet recloser controller. These drawings cover primary circuits, secondary control, 81R frequency protection logic, power supply, and communication interfaces including IEC 101/104, MODBUS, and RS485. The design precisely matches the 60 Hz frequency and 35 kV voltage requirements of the Colombian grid. Detailed wiring and control logic for permanent magnet actuators, CT/VTs, and remote control interfaces ensure stable operation under intense solar fluctuations and electromagnetic interference.

RW Energy Colombia PV Plant 35 kV Recloser Controller Project Case Study

02 Technical Design and Quality Assurance

2.1 Core Technical Design

The RWK-352HBV recloser controller is tailored for low-inertia PV grid integration, with deep optimization of the 81R function:

RW Energy Colombia PV Plant 35 kV Recloser Controller Project Case Study

  • Algorithm Upgrade: Equipped with specialized frequency-slip locking and adaptive reclosing algorithms. It accurately identifies fault types and optimizes reclosing sequences to solve frequency fluctuations at the source.
  • Adaptive Parameter Optimization: Supports a full cycle of "Parameter Rectification - Function Debugging - Scenario Testing - Optimization Iteration" to adapt to complex Colombian grid conditions.
  • EMI/EMC Design: Utilizes high-strength electromagnetic shielding and anti-interference circuits to ensure stability under strong local interference.
  • Integrated Architecture: Integrates fault detection, protection control, and reclosing execution, simplifying field installation and O&M.

RW Energy Colombia PV Plant 35 kV Recloser Controller Project Case Study

2.2 Quality Certification

RW Energy is certified under ISO 9001, ISO 14001, and ISO 45001. All products have passed professional testing by international authoritative agencies, complying with IEC 60255 and other international protection standards.

03 Factory and Field Testing

All equipment underwent comprehensive factory acceptance tests (FAT) and field commissioning according to IEC standards and Colombian grid technical specifications:

  • 81R Frequency Protection Test: Simulated Colombian grid fluctuations to verify frequency-slip locking accuracy. Verified via multi-round slope and pulse frequency tests, achieving a 100 % accuracy rate for 81R actions.

RW Energy Colombia PV Plant 35 kV Recloser Controller Project Case Study

RW Energy Colombia PV Plant 35 kV Recloser Controller Project Case Study

  • Fault Recovery and Reclosing Sequence: Simulated short-circuits and grounding faults. Fault identification response time was ≤ 20 ms, with reclosing sequences perfectly matching grid requirements.
  • EMC/EMI Testing: Simulated strong electromagnetic interference environments. Performance complied with IEC 61000 international standards with zero protection malfunctions.
  • Dielectric and Reliability Tests: Completed 1 min power frequency withstand and impulse withstand tests with zero breakdown. Performed 72-hour continuous load operation with zero parameter drift.
  • Field Commissioning: Technical teams performed multi-round parameter debugging on-site in Colombia, ensuring 100 % adaptation to the owner's and the local utility's requirements.

04 Packaging and Shipping

Equipment utilized heavy-duty export-grade moisture-proof and vibration-proof packaging. Core electronic boards were vacuum-sealed. Reinforced wooden crates were customized to withstand long-distance maritime and inland transport in Colombia. All components were clearly labeled in English and Chinese.

RW Energy Colombia PV Plant 35 kV Recloser Controller Project Case Study

05 Installation and Operation Summary

5.1 Installation Implementation

RW Energy dispatched a professional technical team to the Colombian site to provide full-process technical services:

  • Guided foundation construction, control box wiring, and grounding system installation.
  • Performed insulation tests and wiring verification for 88 units.
  • Conducted on-site energized commissioning and customized 81R parameter configuration.

RW Energy Colombia PV Plant 35 kV Recloser Controller Project Case Study

  • Final Acceptance: Successfully completed multiple rounds of on-site condition testing and optimization iterations, resolving parameter adaptation issues inherited from previous controllers and passing the final acceptance from both the project owner and the local utility.
  • Training and Documentation: Conducted comprehensive operation and troubleshooting training for local O&M personnel and handed over a complete set of O&M manuals, technical drawings, and standard operating procedures (SOPs).

RW Energy Colombia PV Plant 35 kV Recloser Controller Project Case Study

5.2 Operation Feedback

Since commissioning, the equipment has operated stably with zero downtime, exceeding the owner's expectations:

  • Resolved Frequency Stability: The precise application of the 81R function suppressed frequency fluctuations and eliminated frequent tripping.
  • Enhanced Fault Recovery: Fault recovery time was reduced by over 80 %, significantly minimizing generation loss.
  • Improved Grid Stability: Grid-tied voltage and frequency now fully comply with Colombian national standards, receiving high praise from both the utility and the owner.
  • Reduced O&M Costs: Stable operation reduced the need for site inspections and minimized downtime losses.

RW Energy Colombia PV Plant 35 kV Recloser Controller Project Case Study

06 Full Lifecycle O&M Managed Services

RW Energy provides integrated full-lifecycle O&M services for the Colombia project, covering selection, installation, monitoring, regular inspection, maintenance, and status evaluation for recloser controllers, protection devices, and switchgear. Our professional team ensures long-term safety, extends equipment life, and reduces costs for renewable energy developers.

Contact us for customized PV grid-tied protection solutions in the Latin American market!

Deployed Equipment

  • Automatic Recloser Controller
    Description RWK-35 is an intelligent medium Voltage controller used in overhead line grid monitoring for the purpose of overhead line protection. It can be equipped with CW(VB) type vacuum circuit breaker to achieve automatic monitoring, fault analysis and store event records. This unit offers safe line switching of faults on the power grid and provides automatic power recovery. RWK-35 series is suitable for up to 35kV outdoor switchgear include: vacuum circuit breakers, oil circuit breakers a
Leave your contact information to receive the full technical white paper, equipment list, and energy efficiency report for this case. Request Reference Materials
Recent Success Reference
Send inquiry
+86
Click to upload file
Download
Experts Electrical is dedicated to serving the personnel in the global power industry.
Join Experts Electrical, not only can you discover power equipment and power knowledge, but also canhnd like - minded friends!
App Store
Download
Get the IEE Business Application
Use the IEE-Business app to find equipment, obtain solutions, connect with experts, and participate in industry collaboration anytime, anywhere—fully supporting the development of your power projects and business.
Email
E-mail
Chat
Manager
WhatsApp
WhatsApp